Sr.No. |
Description of Work |
Total MT |
Client Name |
Site & Location |
Image |
1 |
Preparation of Detailed Fabrication drawings of Piperack |
2000MT |
Zetwerk Manufacturing Business Pvt.Ltd
|
Numaligarh Refinery
|
View
|
2 |
Preparation of Detailed Fabrication drawings of USAR Gail Project |
2000MT |
Bridge & Roof Co.India Ltd,
|
GAIL India Limited
|
View
|
3 |
DAK Structures at HPCL Refinery |
600MT |
Hindustan Petroleum Corporation Limited
|
Hindustan Petroleum Corporation Limited
|
View
|
4 |
Preparation of Detailed fabrication drawings works of DFCU Unit Part A&B GGSR HMEL Project at Bhatinda Punjab |
7000 MT 6469MT Complete d out of 7000MT |
6469MT Complete d out of 7000MT Bridge & Roof Co. India Ltd.
|
Bhatinda , Punjab
|
View
|
5 |
Developing of Detailed Fabrication drawings of Piperack Structure of NFC Kota Project at NFC Kota site |
4000 MT |
Artson Engineering Limited (A Subsidiary of Tata Projects Limited) NFC Kota , Rajasthan
|
NFC Kota , Rajasthan
|
View
|
6 |
Detailing of Fabrication drawings for Main Power House Buildings at BHEL Patratu |
8000MT |
Artson Engineering Limited (A Subsidiary of Tata Projects Limited)
|
Patratu,Jharkhand
|
View
|
7 |
Preparation of design calculation for bolted structures & detail fabrication drawings for DRPP Nigeria Project |
4000MT |
Offshore Infra Limited
|
DRPP Nigeria
|
View
|
8 |
Preparation of Shop Drawings for Structural Fabrication works at ONGC URAN Plant |
800 MT |
Trupti Infrastructures Pvt. Ltd (BHEL)
|
URAN, Maharashtra
|
View
|
9 |
Preparation of Detailed Fabrication drawings of Hydrocracker Unit at BPCL Refinery Mumbai |
400MT |
Arco Infrastructures Limited BPCL Refinery,
|
Mahul
|
View
|